top of page

Sylvania NSW 2224, Australia

Fire Damage to Strip Mall

Following a fire at this commercial building, Structability went to site in coordination with preparation of scope of works and detailed building design, waterproofing and structural documentation.

INVESTIGATION STAGE

Site inspection and preparation of scope of works

DESIGN DEVELOPMENT STAGE

Waterproofing Design
Structural Design
Stormwater Design
Building Design for accessibility requirements.
Scope of works preparation

CONSTRUCTION STAGE

Project Management and consistent site inspections

BEFORE

AFTER

bottom of page